Trunk pipelines
Installation of pipeline systems up to Ø1220 mm, pipe haulage and lowering-in, spools, shut-off valves and right-of-way access roads.

Pipeline Construction Group LLP · since 2007
Full-cycle construction and installation on trunk oil and gas pipelines, tank farms and industrial infrastructure. Our own 4.9-hectare base, 100+ units of equipment and a Category I construction licence.
01 About
Pipeline Construction Group LLP was founded in Atyrau in 2007. We specialise in architectural, urban planning and construction work, including in-field and trunk oil and gas pipeline networks.
Over 19 years we have delivered work at Kashagan, on the Uzen–Atyrau–Samara oil pipeline, on the CPC Tengiz–Novorossiysk trunk line and at Embamunaigas tank farms — as a contractor to Caspian Pipeline Consortium-K JSC, Stroytransgaz JSC, Montazhspetsstroy JSC and Mekhstroyservis JSC.
We work across the full cycle: engineering preparation and method statements, material supply, earthworks, welding and installation, insulation and corrosion protection, hydrotesting and inspection, land reclamation and handover to the client.


02 Capabilities
Work backed by our Category I licence and by volumes delivered on operating trunk lines.
Installation of pipeline systems up to Ø1220 mm, pipe haulage and lowering-in, spools, shut-off valves and right-of-way access roads.
Gas-shielded (argon), stick and semi-automatic welding. Carbon and stainless steel, Ø ½"–40". 50 welding stations.
Construction and repair of vertical and horizontal steel tanks: inspection, design, foundations, erection, quality control and corrosion protection.
Construction of roads, railways, bridges and overpasses, including major repair and reconstruction.
Mechanised pipeline recoating: cleaning, priming and coating application. Abrasive blasting, Protegol coating, P-1/P-2/P-3 repair sleeves.
Hydrotesting, pigging, gauging, profile surveys and in-line inspection. 100% ultrasonic and radiographic weld inspection.
Site grading, process embankments, excavation and backfill with layer-by-layer compaction to 1.88 g/cm³. Foundations and bases.
Erection of pipe racks and process equipment, secondary steelwork, commissioning.
Cable laying, cable trays, earthing of pipe racks and equipment, cathodic protection, instrumentation and control.
Auger boring of Ø1220 mm pipe up to 60 m long under roads and railways, pulling carrier strings through casings.
Geodetic, geological and hydrogeological surveys: topographic surveying, field soil investigation, survey control networks.
Freight haulage and rental of cranes, pipelayers, low-bed trailers and crew transport. Own fleet of 101 units.
03 Projects
Selected projects from 2007 to 2026. Total value of work delivered: over US$68 million.
Montazhspetsstroy JSC · $2.5M
Northern off-site area: sulphur storage foundations, an oil storage area, underground OW/RW/FW pipelines, RVS-2 and RVS-3 crude oil tanks with a capacity of 80,000 m³, and G1-02, G1-03, G2-06 and PR-52D pipe racks.

Mekhstroyservis JSC · KazTransOil · $4.5M
Full-scope replacement of Ø1020 mm pipe on the 615–645 km and 763–789 km sections: welding, heat-shrink sleeve joint coating, lowering-in, an aerial river crossing, cathodic protection and instrumentation.

Stroytransgaz JSC · $6.9M (+ $1.2M in 2008)
Welding, weld cut-outs and repairs, coating repairs, excavation and lowering-in, cleaning, gauging, inspection and hydrotesting of the 0–130 km section, and displacement of oil from the pipeline being decommissioned.

Caspian Pipeline Consortium-K JSC · $11.2M
Engineering preparation and method statements, launch and reception pits, welding of Ø1220 mm casings and Ø1020 mm carrier strings, trenchless auger boring, pulling strings through casings, relocation of overhead power lines.

Caspian Pipeline Consortium-K JSC · $25M
The company’s largest project. Excavation and undermining of the operating pipeline, 100% ultrasonic weld inspection, mechanised removal of old coating from Ø1020 mm pipe and application of anti-corrosion coating by a coating train, cavity weld repair, land reclamation and handover.

Caspian Pipeline Consortium-K JSC · $15.5M
Hot tapping into the operating pipeline using T.D. Williamson technology with no shutdown: welding of Ø1020 mm split tees, 100% UT and radiographic weld inspection, Protegol anti-corrosion coating, installation of P-3 sleeves.

CPC-K JSC $1M · Pavlodar River Port JSC $200K
Reinforcing the pipeline and the trunk fibre-optic line with Reno mattresses where they cross washouts between salt flats, and building a permanent right-of-way road. Switching over pressure sewer mains made of twin Ø500 and Ø400 mm polyethylene lines, with fusion welding and pneumatic and hydraulic testing.

Mangistauenergomontazhnaladka LLP for Embamunaigas JSC · KZT 230M
Full cycle: foundation preparation, erection, welding and inspection, and anti-corrosion protection of a 1,000 m³ vertical steel tank.

Zhylyoi District Department of Passenger Transport and Roads · ≈$400K
Construction of a road bridge and major repair of the adjoining road section. Delivered in 3.5 months, with a 5-year performance warranty.

04 Resources
We don’t rent our core capacity — that’s what lets us hold schedules on remote sections of the route.
05 Clients and partners
Our cooperation with the Denholm Zholdas group lets us deliver technically complex projects by sharing expertise, knowledge and resources. On every major project we work in coordination with DZ Group.
Alpino Group LLP holds a Category II construction licence. Earthworks, welding, concrete and finishing work, building construction, electrical installation and industrial ventilation.
06 Contact
We prepare a commercial proposal broken down by facility, with a work schedule and payment terms.